Sometimes—but timing determines almost everything.

At 2029 Dakota Trail in Hastings, Cornerstone Construction’s three-bedroom ranch is underway with an expected fall 2026 completion. A buyer may still have opportunities to influence selections, depending on the stage of construction and builder approval.

That wording is worth taking literally. “May still choose” is not the same as an open-ended custom build. A selection that is easy before materials are ordered can become expensive, delay-producing, or impossible after installation begins.

What may still be selectable?

The exact list must come from the builder, but mid-build choices often fall into three categories:

  • Still open: Items not yet ordered or scheduled may offer a choice among the builder’s approved options.

  • Possible with a change order: Some substitutions may be available for an added price, revised schedule, or both.

  • Already committed: Structural decisions, rough plumbing, window locations, cabinetry already ordered, and installed materials are usually difficult or impractical to change.

Rather than asking, “Can I customize it?” ask for a dated selection sheet showing what is included, what remains open, the deadline for each decision, any upgrade pricing, and whether a change could move the completion date.

The home’s planned baseline

Even without changes, the home offers a strong set of practical features: approximately 1,860 finished square feet above grade, three bedrooms, two and one-half baths, a ranch layout, and an attached three-car garage.

The home sits on about one acre in Jones Crossing. The neighborhood’s design preserves more than 25 acres of habitat near the Thornapple River, creating a setting that feels less dense than many new-home communities while remaining part of a defined development.

Below the main floor is a full unfinished basement of approximately 1,860 square feet. It is listed as plumbed for a future bath. That space is not current finished living area, but it can be meaningful for storage and future planning.

Seven questions to ask before requesting a change

If you are interested in shaping the remaining finishes, timing matters. See the latest construction photos and availability for 2029 Dakota Trail, then ask us which selections are still open.

  1. Is the item already ordered, delivered, or installed?

  2. Is the proposed alternative an approved builder option?

  3. What is the exact price difference, including labor and administrative charges?

  4. Will the change affect the expected fall 2026 completion?

  5. Does the substitution affect any warranty coverage?

  6. When is the decision—and any additional deposit—due?

  7. Will the final agreement identify the product, color, model, or allowance in writing?

Written detail matters. A verbal conversation about “something similar” is not as useful as a specification naming the manufacturer, product line, finish, allowance, and responsibility for substitutions.

Changes that deserve extra caution

Late structural requests deserve more scrutiny than cosmetic ones. Moving a wall, changing a window, relocating plumbing, altering electrical plans, or modifying the basement layout can affect permits, inspections, engineering, materials, and multiple trades.

Cosmetic choices may be easier, but even those can be constrained by supply schedules. Flooring, lighting, hardware, counters, and paint colors may already be ordered. If a buyer wants something outside the standard package, the builder may require a signed change order and payment before proceeding.

Do not overlook the unfinished basement

The full basement is one of the property’s largest planning opportunities. Because it is unfinished, buyers should distinguish between the home’s current finished square footage and its possible future use.

Ask about ceiling heights, window and egress locations, mechanical placement, insulation, electrical service, the future bath rough-in, and any association or municipal requirements. If finishing is part of your long-term plan, obtain professional estimates rather than assuming a standard per-square-foot cost.

What a buyer should verify before signing

A new home still deserves due diligence. Review the purchase agreement, specifications, allowances, change-order process, estimated completion language, builder warranty, association documents, site plan, and any landscaping or driveway items not included at delivery. Consider independent inspections at appropriate stages if permitted by the contract.

Completion dates can move because of weather, inspections, labor, material availability, or approved changes. Plan housing, rate locks, and moving logistics with that possibility in mind.

Buyer takeaway

The opportunity at 2029 Dakota Trail is not unlimited customization. It is the possibility of making timely, documented choices while the home is still being built. The sooner a buyer reviews the builder’s remaining-selection list, the more useful that opportunity becomes.

Would you like to walk through the home and review the builder’s remaining-selection list? Call or text Jason Veenstra at 269-350-5514. I can help you understand what is included, which decisions may still be available, and what should be documented before you move forward.

Frequently Asked Questions

When is 2029 Dakota Trail expected to be complete?

Completion is anticipated in fall 2026. Construction schedules can change, so buyers should verify timing and contract language.

Can buyers still select finishes?

Possibly. Remaining choices depend on construction stage, material orders, cost, schedule, and builder approval.

How large is the home?

The home offers approximately 1,860 finished square feet above grade, plus a similarly sized unfinished full basement.

How much land is included?

The listing reports approximately one acre.

Is there an association?

The property is in Jones Crossing. Buyers should review the current governing documents, fees, and any architectural or use restrictions.